Sheffield Scheme Pump Station
Client: | Fulton Hogan Canterbury |
Start Date: | May 2017 |
Completion Date: | October 2017 |
Project Scope:
- Concrete pump station construction.
- Precast panel construction.
Project Description:
Construction of Pump Station II, as part of the Central Plains Irrigation Scheme, using precast panel erection.
Insitu concrete stitching and floor slabs, water proofing of the entire structure, dewatering and major excavation along with working in a remote area.
Alternative construction method was proposed to, and accepted by, the client with the outcome of a quicker build solution saving the client money.