Client: Fulton Hogan Canterbury
Start Date: May 2017
Completion Date: October 2017

Project Scope:

  • Concrete pump station construction.
  • Precast panel construction.

 

Project Description:

Construction of Pump Station II, as part of the Central Plains Irrigation Scheme, using precast panel erection.

Insitu concrete stitching and floor slabs, water proofing of the entire structure, dewatering and major excavation along with working in a remote area.

Alternative construction method was proposed to, and accepted by, the client with the outcome of a quicker build solution saving the client money.